 |
|
This project is a combination of a single story,
site cast tilt-up concrete panel office building and a pre-engineered
metal building with equipment storage mezzanine. The roof over the
tilt-up concrete panel building portion is steel framed with single ply
roof membrane. Scope: Architecture,
Interior Design, Landscaping, Future Planning
Year Constructed: 2000 Size: 33,000 s.f.
Cost: $2,800,000 |
|